Kontekst
In the competitive and energy-intensive manufacturing sector, controlling energy costs while advancing sustainability is a top priority. This Belgian healthcare furniture manufacturer was already using solar energy, but could only meet 35% of its electricity needs from on-site generation. The rest came from the grid, leaving significant room for improvement in energy efficiency and cost control.
Wyzwanie
The company set out to:
- Increase self-sufficiency and reduce grid dependency.
- Maximize solar energy utilization without wasting surplus generation.
- Cut peak demand charges that were driving up operational costs.
Rozwiązanie
The project implemented a comprehensive energy optimization solution that combined:
- 664 additional solar panels to boost renewable generation capacity.
- POWEROAD FLEX 215 All-in-One Outdoor Cabinet ESS, with a capacity of 400kW / 860kWh for large-scale industrial performance.
The system stores excess solar energy during low-demand hours and discharges it strategically during peak demand or high-tariff periods, ensuring zero waste and maximum efficiency.
Project Value
✅ Energy Independence Jump — From 35% to 95% on-site electricity production.
✅ Significant Cost Savings — Reduced grid reliance and lowered demand charges.
✅ No Solar Energy Wasted — Intelligent ESS ensures all generated power is used effectively.
✅ Sustainability Gains — Lower carbon footprint and stronger ESG performance.
The project delivers at least 10 years of reliable returns, supported by POWEROAD’s durable ESS technology with a 6,000-cycle warranty and 80% capacity retention. This installation demonstrates how integrating renewable generation, advanced storage, and intelligent control can help industrial companies achieve near-total energy independence.