Energy storage system case studies

1.5MW / 3.2MWh

Solution:
1.5MW / 3.2MWh, FLEX 215
Location:
Netherlands
Scenario:
Logistic Fleet Charging Station
Application:
Solar self-consumption; Peak Shaving; Demand Response
Profit Model:
Self-sufficiency; Demand Charge Reduction; Peak-Valley Arbitrage
1.5MW 3.2MWh FLEX 215 1 A transport company in the Netherlands is revolutionizing their sustainable transportation with a PV+ESS solution for logistic fleet charging. By seamlessly integrating charging stations, solar panels, and POWEROAD ESS, the transport company is enabling charging from solar energy even during non-sunny periods at the lowest possible cost, optimizing energy usage and promoting grid stability. This project not only reduces reliance on traditional grids but also empowers entrepreneurs to control their energy costs while leveraging renewable sources. 1.5MW 3.2MWh FLEX 215